Abricos LLC
Remodeling

Bathroom Renovation in Littleton, CO

Finished Littleton bathroom renovation with black double vanity and gold mirrors

Finished Littleton bathroom renovation with black double vanity and gold mirrors
Finished Littleton bathroom renovation with black double vanity and gold mirrors
Location
Littleton, CO
Project type
Full Bathroom Renovation
Completed
2026
Duration
10 working days

Projects are identified by city and state only. Residential street addresses and client identities are withheld for privacy, and this case study describes only work documented in the project record or visible in the project photographs.

Project overview

A complete 10-day bathroom renovation

Abricos LLC completed this full bathroom renovation in Littleton, Colorado, in 10 working days. The project kept the practical bathtub and double-vanity layout while replacing the dated finishes with a brighter, coordinated interior.

Client goal

Keep the layout and modernize the room

The homeowner wanted to keep the room's useful bathtub-and-double-vanity arrangement while replacing the dated surfaces, fixtures and lighting with a brighter, more modern finish.

Before

The bathroom before renovation

Before renovation, the bathroom had a wood double vanity with an older countertop, an oversized wall mirror, warm-toned vanity lights, patterned floor tile and an older tub surround.

Littleton bathroom before renovation with wood double vanity and oversized wall mirror
Wide view of the Littleton bathroom before renovation with patterned floor tile and old tub surround
Scope of work

What Abricos LLC completed

  • Removed the dated double vanity, countertop, oversized wall mirror and vanity lighting
  • Removed the existing flooring and old tub-surround finishes
  • Installed large-format polished gray stone-look tile on the floor and full-height tub and shower walls
  • Installed a new bathtub, recessed shower niche, matte-black rainfall shower and handheld fixtures
  • Installed a long black double vanity with a light quartz-style countertop and two undermount sinks
  • Installed two oval gold-tone mirrors, coordinated vanity lighting, brushed-gold plumbing fixtures and cabinet hardware
  • Updated ceiling lighting, exhaust and vent trim, wall finishes and paint
Design and materials

A coordinated gray, black and gold palette

Challenge

The updated finishes needed to work within the retained tub-and-double-vanity layout and make the narrow room feel brighter.

Solution

Abricos LLC used continuous light gray tile, a light countertop and updated lighting to brighten the room, balanced by the black vanity and shower fixtures and coordinated gold-tone details.

After

The finished bathroom

The finished double vanity combines black cabinetry, a light countertop, two undermount sinks and gold-tone mirrors and fixtures.
The retained layout now has full-height gray stone-look tile, updated lighting and a coordinated vanity wall.
The new bathtub sits within full-height polished gray stone-look tile beside the updated vanity.
The tub and shower area includes a recessed niche, rainfall shower and handheld fixture in matte black.
Final result

A brighter bathroom with a practical layout

The completed bathroom is brighter and more modern while retaining the practical bathtub and double-vanity layout. The continuous gray stone-look surfaces, black cabinetry and coordinated gold-tone details give the room a clear, consistent finish.

10-day transformation

Full renovation completed in 10 working days

Abricos LLC completed the removal, surface preparation, tile work, fixture and vanity installation, lighting updates and finish work in 10 working days.

The sequence preserved the established room layout while coordinating the new floor, tub and shower finishes, vanity, mirrors, lighting and paint into one completed interior.

Plan your project

Planning a bathroom renovation in Littleton?

Next step

Planning a similar project?

Share the property, the work you're considering, and your desired timeline. We'll review the initial information and reach out to discuss the appropriate next step.

Request a Consultation