Abricos LLC
Remodeling

Denver Primary Bathroom Remodel and Shower Relocation

Completed glass-enclosed shower and separate bathtub in a Denver bathroom remodel

Completed glass-enclosed shower and separate bathtub in a Denver bathroom remodel
Completed glass-enclosed shower and separate bathtub in a Denver bathroom remodel
Location
Denver, Colorado
Project type
Bathroom Remodeling
Completed
2023
Project overview

About this project

Abricos LLC completed a full primary-bathroom renovation in Denver in 2023. The project included demolition of the existing bathroom, layout reconfiguration and relocation of the shower area. Plumbing modifications were performed by a licensed plumbing contractor coordinated as part of the project. The completed bathroom includes a glass-enclosed tiled shower, separate bathtub, double vanity and updated interior finishes.

Homeowner goal

What the homeowner wanted

The homeowner wanted to completely renovate the existing bathroom and relocate the shower to create a more functional layout.

Layout and shower relocation

Original condition

The existing bathroom was removed to allow the layout and shower location to be reworked.

Scope of work

What we did

  • Full demolition of the existing bathroom
  • Bathroom layout reconfiguration
  • Relocation of the shower area
  • Coordination of plumbing modifications with a licensed plumbing contractor
  • Preparation of the new shower enclosure
  • Installation of tiled shower walls and shower floor
  • Installation of a glass shower enclosure
  • Installation of a separate bathtub
  • Installation of a double vanity
  • Interior wall, floor and finish work
Trade coordination

Shower relocation and trade coordination

Challenge

Relocating the shower required the new layout, plumbing modifications, enclosure and finish work to be coordinated as one sequence.

Solution

Abricos LLC coordinated demolition, layout preparation, licensed plumbing work, shower construction, tile installation and finish work around the revised bathroom layout.

Construction process

During construction

Completed bathroom

Photos from the finished space

Result

The finished bathroom

The completed bathroom combines a glass-enclosed tiled shower, separate bathtub, double vanity and coordinated white and gray finishes within the reconfigured space.

Next step

Planning a similar project?

Share the property, the work you're considering, and your desired timeline. We'll review the initial information and reach out to discuss the appropriate next step.

Request a Consultation